New Developments

Optima Kierland

OPTIMA KIERLANDS

The development of Optima Kierland involved extensive planning and collaboration between architects, engineers, contractors, and other stakeholders. The construction process began with the excavation of the site and the installation of the foundation and structural support system. The building’s facade and interior spaces were then constructed, with careful attention paid to design elements such as lighting, ventilation, and acoustics. The development team also implemented sustainable building practices and materials, including energy-efficient systems and green roofs, to minimize the environmental impact of the project. Throughout the process, the team worked closely with city officials and community members to ensure compliance with local regulations and to address any concerns or feedback.

 

303 LOGISTICS CENTER PHASE 2

The development of 303 Logistics Center Phase 2 involved a detailed planning and construction process. The project began with the preparation of the site, which included grading and the installation of utility systems. The construction of the building itself required extensive coordination between architects, engineers, and contractors, who worked to ensure that the structure was built to specifications and met all safety and building code requirements. In addition to the physical construction of the building, the development process also included the installation of state-of-the-art systems and equipment for heating, cooling, and security. Finally, the site was landscaped and outfitted with parking areas and other amenities before the project was completed and ready for occupancy.

303 Logistics Center Phase 2

 

Germann Commerce Center
GERMANN COMMERCE CENTER

The development of Germann Commerce Center in Queen Creek, Arizona involved a rigorous process of site selection, design, and construction. The development team worked closely with architects, engineers, and contractors to design and construct a modern industrial facility that meets the needs of tenants while also adhering to local building codes and regulations. The site was prepared through grading, excavation, and installation of utilities, and the building was constructed using state-of-the-art materials and techniques. Throughout the development process, the team worked to ensure that the project was completed on time, within budget, and to the satisfaction of all stakeholders involved.

 

I-10 INTERNATIONAL

The new I-10 International construction project in Arizona is expected to have a significant impact on the state’s economy. The project will create jobs for construction workers, engineers, and other professionals, which will boost employment and income levels in the region. Additionally, the new highway is expected to improve transportation efficiency and safety, which will reduce shipping costs and travel time for businesses and consumers. This, in turn, is likely to stimulate economic growth by attracting new businesses to the area, improving access to markets, and increasing investment in the region.

I-10 International

 

Novus Innovation Center
NOVUS INNOVATION CORRIDOR

The new Novus Innovation Center construction project in Tempe, Arizona, is expected to have a significant economic impact on both Arizona State University (ASU) and the city of Tempe. The new center will serve as a hub for entrepreneurship and innovation, providing a collaborative space for ASU faculty, students, and business partners to develop new ideas and technologies. This is likely to stimulate economic growth by attracting new businesses and investment to the area, creating job opportunities, and contributing to the development of a vibrant innovation ecosystem. Additionally, the center’s location in Tempe is expected to further strengthen the city’s reputation as a leading hub for innovation and technology in the region.

 